Keystone Xl Pipeline Summary 2024 Schedule. The operating pressure for keystone xl pipeline will be 1,308psig (pound force per inch). Biden indicates plans to cancel keystone xl pipeline permit on 1st day in office, sources confirm.
Here is a look back at the history of the controversial project: The claim was thrown out by a panel of three arbitrators in july 2024 based on a technicality.